← My Jobs Auto-saving to cloud
SITE SURVEYOR
Site Surveyor Sheet

Site Surveyor Sheet

Filled by the surveyor on the day of the visit. Saved to the Pipedrive deal.

HOW TO USE THIS SHEET
  1. Fill the form on the day of the survey — ideally before you leave the site.
  2. Section A9 (Pricing) is where you set the recommended sell price. Sales must use this as the starting point.
  3. Sign at the bottom and save the file to the Pipedrive deal.
  4. Photos are saved separately to the same Pipedrive deal.
Job Basics
Copy from the Pipedrive deal URL or deal page.
e.g. 'Lloyd Select Newcastle' or 'Mrs Smith, 24 Oak Rd'.
Full address including postcode.
Job Type
ASite Survey
A1 — Access & Site Logistics
Vehicle access to the site straightforward? (gates, height, ground)
Access method required (tick all that apply)
Access equipment supplied by
Parking available for sub's vehicles throughout the job?
Power on site
Water on site
Trading hours, noise limits, school/residential times.
Permits required
Anything the above didn't capture.
A2 — Substrate & Measurements
Count front / left / right / rear / internal as separate.
Substrate types present (tick all)
Mixed substrates on the same elevation?
Existing coating
Adhesion test patch done?
Type, frame material, any damage or sealant issues.
All door + window + garage + security shutters.
e.g. '1 door shutter, 5 window shutters, 1 garage shutter'.
Count and condition.
Material, length in metres, condition, accessibility.
Material and condition.
A3 — Damage & Condition
Visible coating failures? (peeling, flaking, chalking, blistering)
Cracks, splits, or structural damage to substrate?
Rust, corrosion, or metal deterioration?
Rot, timber damage, or moisture ingress?
Previous repairs visible (filler, patches)?
Seals, silicone, mastic damaged?
Glazing damage or leaks (even if not our scope)?
Signage, fixtures, or cabling on elevations?
ALL pre-existing damage photographed?
Describe what the checkboxes above don't fully capture.
A4 — Stripping Decision
Stripping required
Only fill if Partial or Full.
Stripping method
Waste disposal responsibility
Dust / drift / overspray control.
A5 — Product & Coating System
Coating system
Number of coats
Primer required?
Written code only. If match required, write 'MATCH REQUIRED — sample pending'.
Sheen / finish
Warranty offered
e.g. anti-graffiti, high-temp, metal primer.
A6 — Operational Realities
Live trading premises during works?
Stock / vehicles / equipment need moving before sub mobilises?
Pedestrian route management required?
Sensitive neighbours / adjacent properties?
Protection required (tick all)
Cameras, AC, lighting, cabling. Who removes?
Hazardous material suspected? (asbestos, lead paint, lead flashings) ▲ ESCALATE to office if Yes
Structural concerns? (roof load, unstable substrate, unsafe areas)
A7 — Notes
Who's the decision-maker? Gatekeeper? Sensitivities?
Anything said verbally not yet in writing.
What would go wrong if nothing changed?
Add-on work, future leads, referenceable outcomes.
Catch-all.
A8 — Photos
Photos taken:
A9 — Pricing (Surveyor's Recommended Sell Price)
This is the price you recommend the job is sold at, based on what you've scoped above. Sales takes this as the starting point. If they change it, the variance and reason are recorded on the Sales Booking Sheet.
Total job value at standard margins. Whole price ex VAT.
Per day rate used in the calculation.
How many days this job is priced for.
Coatings, primer, consumables.
MEWP / scaffold / scissor lift hire if costed in.
What the price is based on. Things sales should know that affect the price if changed. e.g. 'priced on 2 coats; if client accepts 1 coat reduce by £X'.
A10 — Surveyor Sign-off
SURVEYOR SIGN-OFF I confirm the information in this sheet is accurate, photos are saved to the Pipedrive deal, the recommended sell price reflects the scope priced, and anything material has been flagged.
SAVE THIS SHEET TO THE PIPEDRIVE DEAL — File name: Survey_[ClientName].docx